Project Overview
Demolition of Clearwell No. 2 in its entirety including pumps, piping and concrete structure and construction of a new 0.5 MG cast in place concrete Clearwell No. 4 including over 1,900 cy of concrete; four new vertical turbine high service pumps and one new vertical turbine backwash pump on Clearwell No. 4 including piping, valves, and appurtances; removal and replacement of tube settlers in Clarifier Basins No. 1 and No. 2 including concrete basin wall restoration; upgrade of electrical, instrumentation and control system throughout treatment facility; site work; piping and valves; and new sod and paving.
The contract was $3,352,037 with a critical substantial completion of 210 days. The project was successfully completed on time.