Project Overview
Design-Build project for the Solids Handling Upgrade to the existing Arbennie-Pritchett Water Reclamation Facility. Design and construction for the following scope of work: new Digester concrete tank, diffused aeration system including blowers, sludge thickener pumps and piping, concrete elevated tower structure for Centrifuges, new Centrifuge equipment and piping, new electrical building, and controls.









