Project Overview
Replacement of a manhole 15’ deep alongside Hwy. 98 in Destin, FL. This project included dewatering, bypassing of multiple manholes, sheet pile shoring, hand and machine excavation around existing utilities, and replacement of the manhole. This project required 24hr continuous
work during Memorial Day Weekend.