Project Overview
A new 2.3 MGD WWTF located in McHenry MS at a greenfield site for the newly developed Utility Authority. The project consists of a new Wastewater Treatment Facility including Sitework, Headworks, Sludge Holding Pond, Oxidation Ditch Aeration Basin, two (2) Clarifiers, UV Disinfection, Post Aeration, RAS/WAS Pumping Station, Operations Control Building, Electrical, Instrumentation and Controls, Entrance Road
and Paving. Completed in 2012.



