Project Overview
Force Main Repair and 1700 Area Pump Station
Installation of 32,000 LF of 16” PVC force main and the following upgrades to the 1700 Area Pump Station: sitework, demolition of concrete tanks, two (2) concrete Storage Tanks, Influent Pump Station, Screenings & Grit facility, concrete Drying Beds, concrete flood wall for Electrical Building, piping & valves, new electrical and controls. Completed 2025.